If you’re planning to develop land in Metro Vancouver, Regional Development Cost Charges (DCCs) can represent a significant part of your project budget.
They have been changing a lot recently.
Over the last few years, Metro Vancouver DCC rates increased substantially. In some cases increasing 10x. However, more recently, some rates were actually rolled back. Not a lot, but a bit.
On July 24, 2026, Metro Vancouver adopted changes that reduced the 2026 rates and lowered some of the increases previously planned for 2027.
If you’re evaluating a development site, here are a few things you should know.
1. What are Metro Vancouver DCCs paying for?
The basic idea behind DCCs is that new development contributes toward the infrastructure required to support growth.
Metro Vancouver currently collects regional DCCs for water infrastructure, liquid waste infrastructure and parkland acquisition.
These are separate from municipal DCCs, ACCs, permit fees and many of the other costs that may apply to your project.
For a larger development, these charges can quickly add up to hundreds of thousands—or millions—of dollars.
2. Don’t assume the rate you checked six months ago still applies
DCC rates change.
That’s particularly important right now. Metro Vancouver’s rates increased significantly and were then partially rolled back in July 2026. Further changes are already scheduled for 2027, and Metro Vancouver continues to review its DCC program.
Guess what? More changes are coming.
When preparing a development pro forma, always confirm the current rates and understand when those rates will apply to your project.
Timing matters too. Depending on when an application was submitted and when a building permit or subdivision approval is issued, different rates or in-stream provisions may apply.
Its important to not only understand your anticipated payments, but also to understand your project’s sensitivity to any changes. What would your projected profit look like if you were to miss your building permit schedule and pay the higher DCC rate?
3. Make sure you have the right sewerage area
Metro Vancouver’s liquid waste DCC isn’t one universal rate. There are four sewerage areas:
- Vancouver Sewerage Area
- Fraser Sewerage Area
- North Shore Sewerage Area
- Lulu Island West Sewerage Area
And the rates can be quite different between them.
Don’t assume the municipality tells you the answer. Burnaby, for example, is split between the Vancouver and Fraser Sewerage Areas. Portions of Richmond also fall into different sewerage areas.
I’ve seen projects budgeted using the wrong sewerage area simply because a property was on the other side of a boundary.
On a large development, that seemingly small mistake can make a massive difference to your budget.
Confirm the applicable area for the actual property. Check with the City and with Metro Vancouver on this.
4. Don’t forget about credits for existing development
If you’re redeveloping a property with existing buildings or uses, you may be entitled to credits that reduce the DCCs payable on the new development.
This is something you want to identify early.
Confirm what’s legally existing on the site, what will be demolished, and how the applicable authority will calculate the net increase in development.
For existing buildings, I also recommend having a reliable survey available so everyone is working from the same information. A few thousand square feet of existing floor area can translate into a meaningful credit.
5. Put the DCCs into your pro forma early
You don’t need every detail figured out on day one. But you should have a reasonable allowance for DCCs before deciding what a development site is worth.
As the project advances, keep updating that number as rates, timing and project assumptions become clearer.
Free Resource: Metro Vancouver DCC Calculator
To make that easier, you can use SiteMentor’s Metro Vancouver DCC Calculator. Enter your sewerage area, development type and either the number of residential units or non-residential floor area to get an initial estimate of the applicable Metro Vancouver charges.
It’s a starting point, not a replacement for confirming the charges directly before making a major development decision.
But getting the right number early is a lot better than discovering the wrong one later.
Good luck and remember to confirm your sewerage area!
Could You Benefit From Expert Real Estate Guidance?
If you’d like confidence before moving forward on a development site, SiteMentor Development Consultants provide industry-best development feasibility reports that identify what your property can realistically support, highlights potential constraints, and helps you determine the development strategy that makes the most sense for your goals.